The mine was opened in 1978 by BHP. Longwall mining was undertaken from the mine until May 2001, when the mine was shut down. Teralba Shaft No. 1 and Teralba Shaft No. 2 have been filled.
A 4 MW Waste Coal Mine Gas (Methane) generator is at the site providing electricity into the grid.