The property that the stadium occupies is 8.5 acres (3.4ha).[2] By 2022, the facility was being used for 1,000 games each year.[2]
The stadium was renovated in 2007, after reaching a poor state of repair. During that renovation, lighting was first installed so that the venue could host night games. From 2022 through 2024, the stadium underwent a two-phase $10 million renovation. The first phase replaced the grass field at the stadium (which was in poor condition)[2] with an artificial turf,[2][3] and also replaced the running-track with a new eight-lane track surface. The second phase of the renovations overhauled the locker rooms and bathrooms, upgraded the scoreboard and lighting, added a concessions stand, and added a parking lot. The first phase broke ground in 2022, and the final phase broke ground in 2023.[2] The final phase was completed in 2024.[1]