SR241 is the most elevated highway in Orange County and provides scenic views of both the Santa Ana Mountains and the cities below, passing through 12 different cities and regions along its length.
Legislatively, SR241 is defined to run south to I-5 at San Onofre State Beach on the border with San Diego County. A plan to construct this portion was opposed due to environmental concerns. The county maintains the toll-free Los Patrones Parkway that extends the right-of-way south to Rancho Mission Viejo, but local officials do not intend to hand over control of the parkway to the state.
Route description
SR241 northbound in Rancho Santa Margarita.
SR241 runs along two named tollways: its southern half is the 12-mile (19km) Foothill Transportation Corridor, and its northern half is part of the Eastern Transportation Corridor.
The toll road begins at its interchange with Oso Parkway near Las Flores, while the right-of-way continues south as Los Patrones Parkway. SR241 then heads northward through Rancho Santa Margarita and Trabuco Canyon near O'Neill Regional Park. It then passes through the eastern areas of Mission Viejo and Lake Forest before paralleling the rugged foothills in Irvine. It then runs along the easternmost edge of Irvine, with scenic views on either side, before meeting the eastern terminus of SR133. SR241 continues north as part of the Eastern Transportation Corridor following this interchange. SR241 then meets SR261 and Santiago Canyon Road (CR S18) near Irvine Lake before turning northeastward towards its northern terminus at SR91 on the Anaheim–Yorba Linda border near the Santa Ana River.[2]
The SR 241 toll road was constructed by the Transportation Corridor Agencies, also known as the TCA, and is owned by the state of California. Construction was financed with bonds, which are repaid with toll revenues. Taxpayers are not responsible for repaying any debt if toll revenues fall short.[7]
Future
Proposed extension
SR241 was planned to extend from its current southern terminus at Oso Parkway south to I-5 at the San Diego County border near San Onofre. This southern extension, known as Foothill-South, was intended to be the final piece in Orange County's planned 67-mile (108km) network of public toll roads.[8] The extension would have provided an alternate route from SR91 to I-5 for those traveling from Riverside County and through southeast Orange County, south to San Diego County.[9]
Many conservationists, environmental groups, and some residents of San Clemente opposed the extension to San Onofre State Beach. Former California Attorney General Bill Lockyer filed two lawsuits in 2006, one on behalf of the Native American Heritage Commission. A third lawsuit was filed by a coalition of several groups, including Sierra Club, the Surfrider Foundation, Natural Resources Defense Council.[12] It was later revealed that the TCA funded a study in support of removing the California gnatcatcher from the federal Endangered Species list,[13] which would have made it easier to build the toll road extension.
On February 6, 2008, the California Coastal Commission voted 8-2[14] to reject the planned extension through San Onofre State Beach. The TCA appealed the Coastal Commission's decision to the U.S. Secretary of Commerce.[15] On December 18, 2008, the Department of Commerce announced that it would uphold the California Coastal Commission's ruling that found the TCA's proposed extension inconsistent with the California Coastal Act.[16] In a release issued by the Department of Commerce, the DOC noted that at least one reasonable alternative to the project existed, and that the project was not necessary in the interest of national security.[17]
In November 2016, the TCA reached a legal settlement ending the 15-year dispute with the more than a dozen environmental organizations and the state of California. The settlement guaranteed that any roadway would avoid the Donna O'Neill Land Conservatory, the San Onofre State Beach Park, and other environmentally sensitive areas. The environmental organizations have agreed not to sue the TCA over other potential alignments that connect the 241 Toll Road to the I-5 freeway as long as the alignments do not enter the "environmental avoidance area."[18]
Los Patrones Parkway
Rancho Mission Viejo, which has publicly condemned all the proposed alignments of the SR241 extensions, helped to fund the construction of a 4.5-mile (7.2km) four-lane toll-free freeway known as Los Patrones Parkway. The road, maintained by Orange County, follows the exact alignment as the proposed Tesoro Extension of SR241 between Oso Parkway and Cow Camp Road. Rancho Mission Viejo provided $85 million of the total estimated cost of $100 million to construct the road. Los Patrones Parkway also includes a new multi-purpose pathway on the west side of the highway between Oso Parkway and Chiquita Canyon Drive, two wildlife crossings under the road, wildlife fencing, and replanting of over 100 acres of vegetation. However, local environmental groups expressed concerns that the TCA may acquire Los Patrones Parkway in the future to extend SR241 southward.[19]
View looking north from Oso Parkway as Los Patrones Parkway transitions into SR241 in unincorporated Orange County.
On August 10, 2018, the Orange County Public Works began construction on a $30 million project to turn a section of Oso Parkway into a bridge to allow a direct connection between SR241 and Los Patrones Parkway. The new interchange was completed in mid-January 2021.[20]
Los Patrones Parkway was built in two phases. Phase 1 of the road between Oso Parkway and Chiquita Canyon Drive opened on September 12, 2018.[21] However, due to significant rainfall, the opening of Phase 2 of the road between Chiquita Canyon Drive and Cow Camp Road was delayed twice from the planned deadline of late-2018,[22][23] and did not open until October 17, 2019.[24]
Meanwhile, the TCA continued to explore alternative options to extend the toll road through San Juan Capistrano and San Clemente to I-5. After facing opposition, the TCA Board of Directors voted unanimously on March 12, 2020, to support a proposal to extend the county's toll-free Los Patrones Parkway south to Avenida La Pata near the San Clemente city limit.[25]
In 2021, state senator Patricia Bates introduced Senate Bill 760 to remove the segment between Oso Parkway and I-5 segment from SR241's legal definition, which would permanently kill any plan to convert Los Patrones Parkway to a toll road or any other plan to extend SR241.[26][27] Exit numbers assigned at SR241 remain starting at 14 instead of 1 or 0, assuming there would still be an extension to I-5.[28]
SR 241 to SR 91 Express Lane Connector
The cities of Anaheim and Yorba Linda as well as Caltrans call for select toll lanes on SR 241 to connect with SR 91's toll lanes.[29] The connector will connect northbound SR 241 lanes with eastbound SR 91 express lanes, and westbound SR 91 express lanes with southbound SR 241 lanes. When SR 241 was constructed, there was room left in the middle should the connector come in the future. The toll connector is scheduled to start construction in 2025 and be complete by 2027, with it opening to traffic in 2028.[30]
Tolls
SR241 employs a barrier toll system, where drivers are charged flat-rate tolls based on what particular toll booths they pass through. Since May 13, 2014, the road has been using an all-electronic, open road tolling system.[31] And on October 2, 2019, the license plate tolling program, under the brand name "ExpressAccount", was discontinued.[32] Drivers may still pay using the FasTrak electronic toll collection device, or via a one time payment online 5 days before or after their trip on the toll road.[33] Drivers who do not pay after 5 days will be assessed an additional toll violation penalty.[34]
There are two mainline toll gantries: the Tomato Springs gantry just south of the SR133 interchange, and the Windy Ridge gantry just south of the SR91 interchange. As of July2025[update], both gantries and the northbound exit and southbound entrance at Portola Parkway-North use a variable pricing scheme based on the time of day for FasTrak users (it is not truly congestion priced because toll rates come from a preset schedule and are not based on actual congestion); non-FasTrak drivers must pay the maximum toll ($4.67 at Windy Ridge, $4.46 at Tomato Springs, and $3.35 at Portola Parkway-North) regardless of the day and time. Tolls are also collected at a flat rate for all drivers at selected on-and off-ramps: the southbound exits and northbound entrances of Los Patrones Parkway and Oso Parkway (both $2.74), and Antonio Parkway ($1.93); and the northbound exits and southbound entrances of Los Alisos Boulevard ($1.80), Portola Parkway-South ($1.93), and Alton Parkway ($2.85).[35]
Exit list
Under the official exit list by Caltrans, mileage is measured from the unconstructed southern terminus at Interstate 5 near San Clemente.[28]
The entire route is in Orange County.
This exit list consists of the county-maintained Los Patrones Parkway that local officials do not intend to turn over to Caltrans or TCA for a possible extension of the SR 241 toll road. Thus, the state maintains no postmiles.
The entire route is in Orange County.
12California Department of Transportation. "State Truck Route List". Sacramento: California Department of Transportation. Archived from the original(XLS file) on September 5, 2015. Retrieved June 30, 2015.
↑"Article 2 of Chapter 2 of Division 1". California Streets and Highways Code. Sacramento: California Office of Legislative Counsel. Retrieved February 6, 2019.
↑Natzke, Stefan; Neathery, Mike & Adderly, Kevin (June 20, 2012). "What is the National Highway System?". National Highway System. Washington, DC: Federal Highway Administration. Retrieved July 1, 2012.
↑Raymundo, Shawn (September 27, 2019). "Los Patrones Sees Further Delays". The Capistrano Dispatch. The Capistrano Dispatch. Retrieved October 27, 2019.